PRODUCTION CALCULATOR

Basic Building Material

Compare exact approaches, set machines or an output target, then trace every dependency to its source.

View item details

EXACT RECIPE + PRODUCER

Production option

OUTPUT TARGET

Throughput input mode

1 machine at 100%

300/min total output

UPSTREAM PREVIEW

Trace the full production chain

Expand branches as needed; compare exact v1/v2 choices inline.
UPSTREAM MACHINE SETAll released machines
Use upstream recipes from
  • Basic Building MaterialFabricatorBasic Building Material1 machine300/min
    • Wolfram OreMined or extracted resourceMined or extracted resource30/min
    • Titanium OreMined or extracted resourceMined or extracted resource30/min
How automatic choices work

Automatic choices use a disclosed throughput-first preview, not a whole-factory optimum. Ore remains a terminal mined resource, so node purity is never guessed.

SECONDARY DETAILSDirect machine step & utilitiesTotal output300/min

DIRECT PRODUCTION STEP

Machine-bank flow

IN

Required inputs

  • Wolfram Ore30/min per machine30/min
  • Titanium Ore30/min per machine30/min

PRODUCER

Fabricator

Basic Building Material
Machines
1
Cycles/min
30
OUT

Machine-bank output

  • Basic Building Material300/min per machine300/min

VERIFIED UTILITIES

Machine-bank demand

Power
1010 each
Core load
55 each

FULL-CHAIN TOTALS

Production summary

Sustained source inputs and whole production machines for the currently selected chain.
Resource types
2
Production machines
1 machine
IN

Resources required

Repeated source branches are combined in items/min.

  • Titanium OreSource resource30/min
  • Wolfram OreSource resource30/min

Extraction quick reference

Convert sustained demand into source nodes.

Ore extractor tier

Counts are alternatives assuming every tap uses the same purity.

Resource-node estimates by ore purity
ResourceNeedImpureNormalPure
Titanium Ore30/min160/min each1120/min each1240/min each
Wolfram Ore30/min160/min each1120/min each1240/min each

Machines to build

Ordered from source processing toward final production.

  • FabricatorBasic Building Material · 100% sustained load1×

Identical recipe assignments are consolidated before whole-machine rounding. Extraction estimates are planning references and are not included in the production-machine total.

As of Update 1 · hotfix 0.2.8
Data provenance

The public hotfix above was current when this catalog was captured. Numerical values retain the source dataset’s separate claimed build.

Public hotfix build
Steam build 23761620
Claimed data build
Update 1 0.2.0 · Steam build 22674441
Source snapshot
ea-u1-gv35118973__srdb-2.3.4__20260711T050230Z
Catalog revision
catalog-a24a13016b1371ac0c7fe2d53a58416dadd2b95b0cdfceda1921b0e0a02ea732
Captured
Jul 11, 2026, 5:02:30 AM UTC