PRODUCTION CALCULATOR
Wolfram Ore
Compare exact approaches, set machines or an output target, then trace every dependency to its source.
OUTPUT TARGET
1 machine at 100%
60/min total outputUPSTREAM PREVIEW
Trace the full production chain
Expand branches as needed; compare exact v1/v2 choices inline.UPSTREAM MACHINE SETAll released machines
- Wolfram OreOre ExcavatorWolfram Ore (Impure)1 machine
60/min
How automatic choices work
Automatic choices use a disclosed throughput-first preview, not a whole-factory optimum. Ore remains a terminal mined resource, so node purity is never guessed.
SECONDARY DETAILSDirect machine step & utilitiesTotal output60/min
DIRECT PRODUCTION STEP
Machine-bank flow
Required inputs
No recurring input is listed for this option.
PRODUCER
Ore Excavator
Wolfram Ore (Impure)- Machines
- 1
- Cycles/min
- 30
Machine-bank output
- Wolfram Ore60/min per machine
60/min
VERIFIED UTILITIES
Machine-bank demand
- Power
- 55 each
- Core load
- 33 each
FULL-CHAIN TOTALS
Production summary
Sustained source inputs and whole production machines for the currently selected chain.- Resource types
- 0
- Production machines
- 1 machine
Resources required
Repeated source branches are combined in items/min.
No recurring source input is required.
Machines to build
Ordered from source processing toward final production.
- Ore ExcavatorWolfram Ore (Impure) · 100% sustained load
1×
Identical recipe assignments are consolidated before whole-machine rounding. Extraction estimates are planning references and are not included in the production-machine total.
Data provenance
The public hotfix above was current when this catalog was captured. Numerical values retain the source dataset’s separate claimed build.
- Public hotfix build
- Steam build 23761620
- Claimed data build
- Update 1 0.2.0 · Steam build 22674441
- Source snapshot
ea-u1-gv35118973__srdb-2.3.4__20260711T050230Z- Catalog revision
catalog-a24a13016b1371ac0c7fe2d53a58416dadd2b95b0cdfceda1921b0e0a02ea732- Captured
- Jul 11, 2026, 5:02:30 AM UTC